Region ALL SET FOR INSTALLATION Share this:FacebookX June 11, 2023 ALL SET FOR INSTALLATION — The sub-station of the Benguet Electric Cooperative in Bulalacao, Mankayan is being readied for the installation of the 10 megawatt ampere transformer that will be rented from the Ilocos Sur Electric Cooperative. Some areas in northern Benguet have been hit by power outage for days now. — Contributed photos Continue Reading Previous Previous post: Bontoc LGU applies incident command system in EQ drillNext Next post: Reading camp set in July Related News FORMALLY INSTALLED May 12, 2024 Amnesty Int’l reiterates need to abolish Nat’l TF-ELCAC May 12, 2024